Fields: WAYSIDE CHAPEL (YEGUA)
Cum Oil
0 BBL
Cum Gas
827k MCF
Wells
1
Production
1993-10 — 1995-11
Peak Month
1993-11
Production History
Cum Oil: 0 BBL Cum Gas: 827,226 MCF
Wells (1)
| WELL# | API | OPERATOR | PERMITS | DEPTH | LAST_ISSUED |
|---|---|---|---|---|---|
| 2 | 42-239-32723 | ANADARKO PETROLEUM CORP. | 2 | 7,500 | 1995-02-17 |