Fields: CANELO (I-08)
Cum Oil
0 BBL
Cum Gas
6.7M MCF
Wells
1
Production
2001-07 — 2019-06
Peak Month
2003-11
Production History
Cum Oil: 0 BBL Cum Gas: 6,688,617 MCF
Wells (1)
| WELL# | API | OPERATOR | PERMITS | DEPTH | LAST_ISSUED |
|---|---|---|---|---|---|
| 48 | 42-273-32396 | EXXON MOBIL CORPORATION | 1 | 10,500 | 2003-07-24 |