fields: PEARSALL (BUDA, S.)
cum_oil
113k BBL
cum_gas
0 MCF
wells
1
production
2013-04 — 2026-03
peak_month
2013-04
-- production_history
cum_oil: 113,265 BBL cum_gas: 0 MCF
-- decline_curve_analysis
qi
4,490 BBL/mo
Di (annual)
220.3%
b-factor
0.7
EUR
68,989 BBL
R-squared
0.559
type
hyperbolic
-- wells (1)
| WELL# | API | OPERATOR | PERMITS | DEPTH | LAST_ISSUED |
|---|---|---|---|---|---|
| 1H | 42-127-35321 | SAGE ENERGY COMPANY | 2 | 7,200 | 2013-01-31 |