Fields: JAILHOUSE (FUSSELMAN)
Cum Oil
72k BBL
Cum Gas
0 MCF
Wells
3
Production
2011-03 — 2026-03
Peak Month
2013-06
Production History
Cum Oil: 72,444 BBL Cum Gas: 0 MCF
Decline Curve Analysis
qi
1,130 BBL/mo
Di (annual)
169.1%
b-factor
1.2
EUR
46,645 BBL
R-squared
0.544
type
hyperbolic
Wells (3)
| WELL# | API | OPERATOR | PERMITS | DEPTH | LAST_ISSUED |
|---|---|---|---|---|---|
| 3 | 42-173-33921 | APACHE CORPORATION | 3 | 10,300 | 2014-10-08 |
| 5 | 42-173-35547 | APACHE CORPORATION | 1 | 10,500 | 2013-01-14 |
| 6 | 42-173-35513 | APACHE CORPORATION | 1 | 10,500 | 2012-12-20 |