Fields: JAILHOUSE (FUSSELMAN)
Cum Oil
256k BBL
Cum Gas
0 MCF
Wells
1
Production
2011-03 — 2026-03
Peak Month
2014-03
Production History
Cum Oil: 256,494 BBL Cum Gas: 0 MCF
Decline Curve Analysis
qi
6,162 BBL/mo
Di (annual)
114.5%
b-factor
0.7
EUR
171,552 BBL
R-squared
0.936
type
hyperbolic
Wells (1)
| WELL# | API | OPERATOR | PERMITS | DEPTH | LAST_ISSUED |
|---|---|---|---|---|---|
| 1 | 42-173-33922 | APACHE CORPORATION | 2 | 10,300 | 2011-01-05 |