Fields: JAILHOUSE (FUSSELMAN)
Cum Oil
36k BBL
Cum Gas
0 MCF
Wells
1
Production
2011-11 — 2026-03
Peak Month
2012-01
Production History
Cum Oil: 35,504 BBL Cum Gas: 0 MCF
Decline Curve Analysis
qi
3,397 BBL/mo
Di (annual)
232.8%
b-factor
0.3
EUR
24,991 BBL
R-squared
0.893
type
hyperbolic
Wells (1)
| WELL# | API | OPERATOR | PERMITS | DEPTH | LAST_ISSUED |
|---|---|---|---|---|---|
| 1 | 42-173-34497 | APACHE CORPORATION | 1 | 11,000 | 2011-09-19 |