Fields: JAILHOUSE (FUSSELMAN)
Cum Oil
38k BBL
Cum Gas
0 MCF
Wells
2
Production
2012-03 — 2026-03
Peak Month
2014-03
Production History
Cum Oil: 37,841 BBL Cum Gas: 0 MCF
Decline Curve Analysis
qi
1,359 BBL/mo
Di (annual)
329.6%
b-factor
0.7
EUR
14,379 BBL
R-squared
0.830
type
hyperbolic
Wells (2)
| WELL# | API | OPERATOR | PERMITS | DEPTH | LAST_ISSUED |
|---|---|---|---|---|---|
| 3 | 42-173-35893 | APACHE CORPORATION | 1 | 10,300 | 2013-06-12 |
| 2 | 42-173-34735 | APACHE CORPORATION | 1 | 10,300 | 2012-01-26 |