42-245-31790
Final CompletionHMC/HNG CROW
JEFFERSON County · District 3 · PETROTEX ENGINEERING COMPANY · BIG HILL (FRIO 10 400)
Permits
3
Max Depth
13,250 ft
First Permit
1984-08-02
Latest Activity
1991-06-17
Lifespan
7 yrs
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1992-07-29
Shut-In
—
Plugged
2025-05-22
!
EWA / Production operator mismatch
Scheduling: PETROTEX ENGINEERING COMPANY ≠ Production: C/A LIMITED (reported 1996-09)
Resolved via: scheduling → PETROTEX ENGINEERING COMPANY
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2026-03
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (3)
Permit Applications (4)
#388731 A PETROTEX ENGINEERING COMPANY
received 1992-05-15
#247259 X HANSON MINERALS CO.
received 1991-06-03
#388731 A PETROTEX ENGINEERING COMPANY
received 1991-06-03
#247259 A HANSON MINERALS CO.
received 1984-08-02
Well Details
- Well Number
- 1
- Max Depth
- 13,250 ft
- Drill Type
- Vertical
- County
- JEFFERSON
- District
- 3
- Operator
- PETROTEX ENGINEERING COMPANY
- Completed
- 1992-07-29
Operator
- Location
- CYPRESS
- P-5 Status
- Y (filed 2025-07-04)
- Cum Oil (all leases)
- 8,298 bbl
- Cum Gas (all leases)
- 1,117,113 mcf
- Activities
- OPRS/G
- Total Permits
- 4