42-495-00412

Final Completion

PURE-WALTON

WINKLER County · District 8 · ARCH PETROLEUM INC. · KEYSTONE (SILURIAN)

RRC Lookup

Permits

2

Max Depth

9,875 ft

First Permit

1990-05-22

Latest Activity

1991-09-25

Lifespan

1 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1990-05-10

Shut-In

Plugged

!

EWA / Production operator mismatch

Scheduling: ARCH PETROLEUM INC. ≠ Production: XTO ENERGY INC. (reported 2022-12)

Resolved via: schedulingARCH PETROLEUM INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#392146 A ARCH PETROLEUM INC.
received 1991-09-23
#373551 A ARCH PETROLEUM INC.
received 1990-05-18

Well Details

Well Number
5E
Max Depth
9,875 ft
Drill Type
Vertical
County
WINKLER
District
8
Completed
1990-05-10

Operator

Location
HOUSTON
P-5 Status
Y (filed 2006-03-03)
Cum Oil (all leases)
978,743 bbl
Cum Gas (all leases)
21,047,452 mcf
Total Permits
70

External Links

Live © 2026 Petrora