42-495-03422

Final Completion

BASH

WINKLER County · District 8 · ARCH PETROLEUM INC. · KEYSTONE (SILURIAN)

RRC Lookup

Permits

2

Max Depth

10,030 ft

First Permit

1984-12-31

Latest Activity

1992-09-30

Lifespan

8 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1990-09-09

Shut-In

Plugged

!

EWA / Production operator mismatch

Scheduling: ARCH PETROLEUM INC. ≠ Production: XTO ENERGY INC. (reported 2019-07)

Resolved via: schedulingARCH PETROLEUM INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#403743 A ARCH PETROLEUM INC.
received 1992-09-22
#263174 A PHILLIPS OIL COMPANY
received 1984-12-31

Well Details

Well Number
7
Max Depth
10,030 ft
Drill Type
Vertical
County
WINKLER
District
8
Completed
1990-09-09

Operator

Location
HOUSTON
P-5 Status
Y (filed 2006-03-03)
Cum Oil (all leases)
978,743 bbl
Cum Gas (all leases)
21,047,452 mcf
Total Permits
70

External Links

Live © 2026 Petrora