Fields: PAN-GIL RANCH (CANYON)
Cum Oil
0 BBL
Cum Gas
9k MCF
Wells
1
Production
1993-01 — 1996-11
Peak Month
1995-04
Production History Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil: 0 BBL Cum Gas: 8,525 MCF
RRC production reported through Apr 2026 · recent months incomplete
Operator History (from monthly production reports)
Wells (1)
| WELL# | API | OPERATOR | PERMITS | DEPTH | LAST_ISSUED |
|---|---|---|---|---|---|
| 4014 | 42-137-30968 | SMITH PIPE OF ABILENE | 2 | 2,800 | 1987-10-20 |