STILES 1

Gas · District 10 · Lease #212628

Operator: TAPSTONE ENERGY, LLC

Cum Oil

0 BBL

Cum Gas

2.0M MCF

Wells

1

Production

2005-07 — 2025-10

Peak Month

2005-08

Production History

Cum Oil: 0 BBL Cum Gas: 1,962,218 MCF

RRC production reported through Apr 2026 · recent months incomplete

Operator History (from monthly production reports)

2021-06 — 2026-06 FORMENTERA OPERATIONS LLC 61 mo
2015-01 — 2021-05 TAPSTONE ENERGY, LLC 77 mo
2005-07 — 2014-12 APACHE CORPORATION 114 mo

Wells (1)

WELL#APIOPERATORPERMITSDEPTHLAST_ISSUED
101FORMENTERA OPERATIONS LLC218,0002008-08-06