STILES 1

Gas · District 10 · Lease #228628

Operator: TAPSTONE ENERGY, LLC

Cum Oil

0 BBL

Cum Gas

3.6M MCF

Wells

1

Production

2007-03 — 2026-04

Peak Month

2007-04

Production History

Cum Oil: 0 BBL Cum Gas: 3,596,287 MCF

RRC production reported through Apr 2026 · recent months incomplete

Operator History (from monthly production reports)

2021-06 — 2026-07 FORMENTERA OPERATIONS LLC 62 mo
2015-01 — 2021-05 TAPSTONE ENERGY, LLC 77 mo
2007-03 — 2014-12 APACHE CORPORATION 94 mo

Wells (1)

WELL#APIOPERATORPERMITSDEPTHLAST_ISSUED
801FORMENTERA OPERATIONS LLC218,0002014-08-06