PUIG GAS UNIT 2

Gas · District 04 · Lease #98358

Operator: RIDDLE ENGINEERING CORP.

Cum Oil

0 BBL

Cum Gas

18k MCF

Wells

1

Production

1993-01 — 1994-08

Peak Month

1993-12

Production History

Cum Oil: 0 BBL Cum Gas: 17,867 MCF

RRC production reported through Apr 2026 · recent months incomplete

Operator History (from monthly production reports)

2002-10 — 2026-07 EL GATO SWD INC. 286 mo
2002-03 — 2002-09 RIDDLE ENGINEERING CORP. 7 mo
1993-01 — 2002-02 MUELLER ENGINEERING CORP. 110 mo

Wells (1)

WELL#APIOPERATORPERMITSDEPTHLAST_ISSUED
2EL GATO SWD INC.18,4001980-12-22