HARBIN, VICTORIA

Gas · District 7B · Lease #139205

Operator: SMITH PIPE OF ABILENE

Cum Oil

0 BBL

Cum Gas

21k MCF

Wells

1

Production

1993-01 — 2010-05

Peak Month

1993-01

Production History

Cum Oil: 0 BBL Cum Gas: 20,717 MCF

RRC production reported through Apr 2026 · recent months incomplete

Operator History (from monthly production reports)

2013-06 — 2013-09 SMITH PIPE OF ABILENE 4 mo
1993-01 — 2013-05 NORTH RIDGE CORPORATION 245 mo

Wells (1)

WELL#APIOPERATORPERMITSDEPTHLAST_ISSUED
1NORTH RIDGE CORPORATION24,0001993-04-21