Fields: WHITEHEAD (STRAWN)
Cum Oil
0 BBL
Cum Gas
20k MCF
Wells
1
Production
1993-01 — 1999-03
Peak Month
1993-01
Production History Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil: 0 BBL Cum Gas: 19,843 MCF
RRC production reported through Apr 2026 · recent months incomplete
Operator History (from monthly production reports)
Wells (1)
| WELL# | API | OPERATOR | PERMITS | DEPTH | LAST_ISSUED |
|---|---|---|---|---|---|
| 79 | 42-105-35040 | SMITH PIPE OF ABILENE | 1 | 9,600 | 1985-05-03 |