FIELDS 57

Gas · District 7C · Lease #177601

Operator: SMITH PIPE OF ABILENE

Cum Oil

0 BBL

Cum Gas

0 MCF

Wells

1

Production

2000-06 — 2001-11

Peak Month

2000-06

Production History

Cum Oil: 0 BBL Cum Gas: 0 MCF

RRC production reported through Apr 2026 · recent months incomplete

Operator History (from monthly production reports)

2001-08 — current SMITH PIPE OF ABILENE 4 mo
2000-06 — 2001-07 DREYFUS, LOUIS NATURAL GAS CORP 14 mo

Wells (1)

WELL#APIOPERATORPERMITSDEPTHLAST_ISSUED
3SMITH PIPE OF ABILENE15,8002000-04-11