FAITH TORO X UNIT DIM

Oil · District 01 · Lease #19546

Operator: SILVERBOW RESOURCES OPER, LLC

Cum Oil

176k BBL

Cum Gas

1.0M MCF

casinghead

Wells

1

Production

2018-10 — 2026-04

Peak Month

2018-11

Production History

Cum Oil: 176,236 BBL Cum Gas: 1,027,127 MCF

RRC production reported through Apr 2026 · recent months incomplete

Decline Curve Analysis

qi

14,380 BBL/mo

Di (annual)

416.5%

b-factor

0.9

EUR

183,240 BBL

R-squared

0.905

type

hyperbolic

Operator History (from monthly production reports)

2026-05 — 2026-07 CRESCENT ENERGY OPERATING, LLC 3 mo
2023-11 — 2026-04 SILVERBOW RESOURCES OPER, LLC 30 mo
2018-10 — 2023-10 CHESAPEAKE OPERATING, L.L.C. 61 mo

Wells (1)

WELL#APIOPERATORPERMITSDEPTHLAST_ISSUED
F 1HSILVERBOW RESOURCES OPER, LLC19,0002017-11-10