FAITH TORO Q UNIT DIM

Oil · District 01 · Lease #19570

Operator: SILVERBOW RESOURCES OPER, LLC

Cum Oil

291k BBL

Cum Gas

2.1M MCF

casinghead

Wells

1

Production

2018-10 — 2026-04

Peak Month

2018-11

Production History

Cum Oil: 291,181 BBL Cum Gas: 2,068,484 MCF

RRC production reported through Apr 2026 · recent months incomplete

Decline Curve Analysis

qi

23,529 BBL/mo

Di (annual)

262.1%

b-factor

0.8

EUR

371,069 BBL

R-squared

0.980

type

hyperbolic

Operator History (from monthly production reports)

2026-05 — 2026-07 CRESCENT ENERGY OPERATING, LLC 3 mo
2023-11 — 2026-04 SILVERBOW RESOURCES OPER, LLC 30 mo
2018-10 — 2023-10 CHESAPEAKE OPERATING, L.L.C. 61 mo

Wells (1)

WELL#APIOPERATORPERMITSDEPTHLAST_ISSUED
D 1HSILVERBOW RESOURCES OPER, LLC29,0002017-11-29