UNIVERSITY 7-38C

Oil · District 08 · Lease #25106

Operator: HANLEY PETROLEUM INC.

Fields: HUTEX (DEAN)

Cum Oil

1 BBL

Cum Gas

1 MCF

casinghead

Wells

1

Production

1993-01 — 1993-02

Peak Month

1993-02

Production History

Cum Oil: 1 BBL Cum Gas: 1 MCF

RRC production reported through Apr 2026 · recent months incomplete

Operator History (from monthly production reports)

1993-01 — 1993-03 HANLEY PETROLEUM INC. 3 mo

Wells (1)

WELL#APIOPERATORPERMITSDEPTHLAST_ISSUED
1HANLEY PETROLEUM INC.110,0001978-06-19