SCHAFER

Oil · District 08 · Lease #28024

Operator: SMITH PIPE OF ABILENE

Cum Oil

2k BBL

Cum Gas

11k MCF

casinghead

Wells

1

Production

1993-01 — 1994-05

Peak Month

1993-08

Production History

Cum Oil: 1,993 BBL Cum Gas: 10,645 MCF

RRC production reported through Apr 2026 · recent months incomplete

Decline Curve Analysis

qi

216 BBL/mo

Di (annual)

123.5%

b-factor

0.0

EUR

2,092 BBL

R-squared

0.388

type

exponential

Operator History (from monthly production reports)

1995-11 — 1996-04 SMITH PIPE OF ABILENE 6 mo
1995-10 — 1995-10 LEMON, RICHARD G. 1 mo
1993-01 — 1995-09 MALLON OIL COMPANY 33 mo

Wells (1)

WELL#APIOPERATORPERMITSDEPTHLAST_ISSUED
1SMITH PIPE OF ABILENE110,0001982-12-13