Fields: ADDIS (SAN ANDRES)
Cum Oil
24k BBL
Cum Gas
233k MCF
casinghead
Wells
1
Production
1993-01 — 2026-04
Peak Month
2006-07
Production History Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil: 24,271 BBL Cum Gas: 232,633 MCF
RRC production reported through Apr 2026 · recent months incomplete
Decline Curve Analysis
qi
131 BBL/mo
Di (annual)
7.9%
b-factor
0.0
EUR
19,387 BBL
R-squared
0.331
type
exponential
Operator History (from monthly production reports)
Wells (1)
| WELL# | API | OPERATOR | PERMITS | DEPTH | LAST_ISSUED |
|---|---|---|---|---|---|
| 340 | 42-135-34163 | BELL ENERGY | 1 | 4,600 | 1983-05-06 |