PHILLIPS 58

Oil · District 08 · Lease #41035

Operator: APACHE CORPORATION

Cum Oil

257k BBL

Cum Gas

857k MCF

casinghead

Wells

1

Production

2011-03 — 2026-04

Peak Month

2014-03

Production History

Cum Oil: 257,483 BBL Cum Gas: 857,271 MCF

RRC production reported through Apr 2026 · recent months incomplete

Decline Curve Analysis

qi

8,288 BBL/mo

Di (annual)

180.5%

b-factor

0.8

EUR

181,458 BBL

R-squared

0.947

type

hyperbolic

Operator History (from monthly production reports)

2011-03 — 2026-07 APACHE CORPORATION 185 mo

Wells (1)

WELL#APIOPERATORPERMITSDEPTHLAST_ISSUED
1APACHE CORPORATION210,3002011-01-05