Fields: PHANTOM (WOLFCAMP)
Cum Oil
118k BBL
Cum Gas
885k MCF
casinghead
Wells
1
Production
2018-08 — 2026-03
Peak Month
2018-10
Production History Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil: 117,654 BBL Cum Gas: 885,010 MCF
RRC production reported through Apr 2026 · recent months incomplete
Decline Curve Analysis
qi
8,101 BBL/mo
Di (annual)
128.3%
b-factor
0.4
EUR
125,445 BBL
R-squared
0.806
type
hyperbolic
Operator History (from monthly production reports)
Wells (1)
| WELL# | API | OPERATOR | PERMITS | DEPTH | LAST_ISSUED |
|---|---|---|---|---|---|
| H001 | 42-371-39716 | SWORDFISH ENERGY OPERATING, LLC | 3 | 10,209 | 2020-01-06 |