Fields: PHANTOM (WOLFCAMP)
Cum Oil
4.4M BBL
Cum Gas
11.2M MCF
casinghead
Wells
9
Production
2020-02 — 2026-04
Peak Month
2021-10
Production History Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil: 4,410,664 BBL Cum Gas: 11,236,696 MCF
RRC production reported through Apr 2026 · recent months incomplete
Decline Curve Analysis
qi
204,533 BBL/mo
Di (annual)
329.4%
b-factor
2.0
EUR
12,804,179 BBL
R-squared
0.564
type
hyperbolic
Operator History (from monthly production reports)
Wells (9)
| WELL# | API | OPERATOR | PERMITS | DEPTH | LAST_ISSUED |
|---|---|---|---|---|---|
| 123HR | 42-301-35050 | XTO ENERGY INC. | 1 | 12,800 | 2020-03-10 |
| 101H | 42-301-34683 | XTO ENERGY INC. | 1 | 12,300 | 2019-08-14 |
| 102H | 42-301-34684 | XTO ENERGY INC. | 1 | 12,300 | 2019-08-14 |
| 111H | 42-301-34686 | XTO ENERGY INC. | 1 | 12,500 | 2019-08-14 |
| 112H | 42-301-34687 | XTO ENERGY INC. | 1 | 12,500 | 2019-08-14 |
| 121H | 42-301-34689 | XTO ENERGY INC. | 2 | 12,600 | 2019-08-14 |
| 122H | 42-301-34690 | XTO ENERGY INC. | 1 | 12,600 | 2019-08-14 |
| 123H | 42-301-34691 | XTO ENERGY INC. | 1 | 12,600 | 2019-08-14 |
| 131H | 42-301-34692 | XTO ENERGY INC. | 1 | 12,800 | 2019-08-14 |