EL DIABLO 79-78

Oil · District 08 · Lease #57792

Operator: HIGH NOON RESOURCES, LLC

Cum Oil

1.3M BBL

Cum Gas

959k MCF

casinghead

Wells

4

Production

2022-06 — 2026-04

Peak Month

2022-07

Production History

Cum Oil: 1,307,497 BBL Cum Gas: 958,637 MCF

RRC production reported through Apr 2026 · recent months incomplete

Decline Curve Analysis

qi

110,175 BBL/mo

Di (annual)

238.2%

b-factor

0.8

EUR

1,891,321 BBL

R-squared

0.946

type

hyperbolic

Operator History (from monthly production reports)

2024-03 — 2026-07 HIGH NOON RESOURCES, LLC 29 mo
2022-06 — 2024-02 ELEMENT PETROLEUM OP III, LLC 21 mo

Wells (4)

WELL#APIOPERATORPERMITSDEPTHLAST_ISSUED
5LSHIGH NOON RESOURCES, LLC19,5002021-10-27
5WAHIGH NOON RESOURCES, LLC19,5002021-10-27
6LSHIGH NOON RESOURCES, LLC19,5002021-10-27
6WAHIGH NOON RESOURCES, LLC19,5002021-10-27