Fields: TWO GEORGES (BONE SPRING)
Cum Oil
33k BBL
Cum Gas
40k MCF
casinghead
Wells
1
Production
2024-05 — 2026-04
Peak Month
2024-06
Production History Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil: 33,144 BBL Cum Gas: 40,490 MCF
RRC production reported through Apr 2026 · recent months incomplete
Operator History (from monthly production reports)
Wells (1)
| WELL# | API | OPERATOR | PERMITS | DEPTH | LAST_ISSUED |
|---|---|---|---|---|---|
| 2712H | 42-475-37931 | PDEH LLC | 3 | 11,900 | 2019-07-03 |