Fields: CARTER-NEW MEXICO (SAN ANDRES)
Cum Oil
3k BBL
Cum Gas
2k MCF
casinghead
Wells
5
Production
1993-01 — 1998-12
Peak Month
1993-01
Production History Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil: 3,154 BBL Cum Gas: 2,293 MCF
RRC production reported through Apr 2026 · recent months incomplete
Decline Curve Analysis
qi
235 BBL/mo
Di (annual)
633.4%
b-factor
0.7
EUR
1,204 BBL
R-squared
0.510
type
hyperbolic
Operator History (from monthly production reports)
Wells (5)
| WELL# | API | OPERATOR | PERMITS | DEPTH | LAST_ISSUED |
|---|---|---|---|---|---|
| 4W | 42-165-33189 | SMITH PIPE OF ABILENE | 1 | 5,300 | 1985-03-12 |
| 2W | 42-165-32970 | SMITH PIPE OF ABILENE | 1 | 5,300 | 1984-09-18 |
| 1W | 42-165-32912 | SMITH PIPE OF ABILENE | 1 | 5,300 | 1984-07-02 |
| 3 | 42-165-31224 | L.C.S. PRODUCTION COMPANY | 1 | 5,250 | 1977-09-22 |
| 2 | 42-165-01039 | SMITH PIPE OF ABILENE | -- | -- | -- |