Fields: ELIDA (ELLENBURGER)
Cum Oil
713 BBL
Cum Gas
9 MCF
casinghead
Wells
2
Production
1993-01 — 1994-06
Peak Month
1993-03
Production History Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil: 713 BBL Cum Gas: 9 MCF
RRC production reported through Apr 2026 · recent months incomplete
Operator History (from monthly production reports)
Wells (2)
| WELL# | API | OPERATOR | PERMITS | DEPTH | LAST_ISSUED |
|---|---|---|---|---|---|
| 2 | 42-169-31805 | SMITH PIPE OF ABILENE | 1 | 8,350 | 1982-03-08 |
| 1 | 42-169-31585 | SMITH PIPE OF ABILENE | 1 | 8,193 | 1981-07-15 |