Fields: CARTER-NEW MEXICO (SAN ANDRES)
Cum Oil
8k BBL
Cum Gas
21 MCF
casinghead
Wells
2
Production
1993-01 — 1998-12
Peak Month
1998-09
Production History Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil: 7,963 BBL Cum Gas: 21 MCF
RRC production reported through Apr 2026 · recent months incomplete
Operator History (from monthly production reports)
Wells (2)
| WELL# | API | OPERATOR | PERMITS | DEPTH | LAST_ISSUED |
|---|---|---|---|---|---|
| 5W | 42-165-33293 | SMITH PIPE OF ABILENE | 1 | 5,300 | 1985-06-21 |
| 3C | 42-165-32914 | SMITH PIPE OF ABILENE | 1 | 5,300 | 1984-07-05 |