Fields: LAKEWOOD & FULTON (SILURO DEV.)
Cum Oil
66k BBL
Cum Gas
6k MCF
casinghead
Wells
1
Production
1993-01 — 1998-09
Peak Month
1993-01
Production History Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil: 65,699 BBL Cum Gas: 6,400 MCF
RRC production reported through Apr 2026 · recent months incomplete
Decline Curve Analysis
qi
1,400 BBL/mo
Di (annual)
15.8%
b-factor
0.0
EUR
105,955 BBL
R-squared
0.366
type
exponential
Operator History (from monthly production reports)
Wells (1)
| WELL# | API | OPERATOR | PERMITS | DEPTH | LAST_ISSUED |
|---|---|---|---|---|---|
| 1 | 42-115-32128 | SMITH PIPE OF ABILENE | 2 | 12,500 | 2012-04-05 |