WYLIE "A"

Oil · District 8A · Lease #65820

Operator: T-N-T ENGINEERING, INC.

Cum Oil

296k BBL

Cum Gas

22 MCF

casinghead

Wells

21

Production

1993-01 — 2026-04

Peak Month

1993-11

Production History

Cum Oil: 295,723 BBL Cum Gas: 22 MCF

RRC production reported through Apr 2026 · recent months incomplete

Decline Curve Analysis

qi

5,036 BBL/mo

Di (annual)

102.4%

b-factor

1.2

EUR

292,759 BBL

R-squared

0.906

type

hyperbolic

Operator History (from monthly production reports)

2019-08 — 2026-07 DAYLIGHT PETROLEUM LLC 84 mo
2016-07 — 2019-07 AVAD OPERATING, LLC 37 mo
1997-10 — 2016-06 T-N-T ENGINEERING, INC. 225 mo
1993-01 — 1997-09 PRIMROSE OPERATING COMPANY 57 mo

Wells (21)

WELL#APIOPERATORPERMITSDEPTHLAST_ISSUED
602DAYLIGHT PETROLEUM LLC14,5001988-09-08
601DAYLIGHT PETROLEUM LLC14,5001988-08-03
4015DAYLIGHT PETROLEUM LLC14,0001988-07-25
4014DAYLIGHT PETROLEUM LLC16,0001988-06-03
4011DAYLIGHT PETROLEUM LLC16,0001988-05-12
4012DAYLIGHT PETROLEUM LLC16,0001988-05-12
4010DAYLIGHT PETROLEUM LLC25,0001988-04-07
4009DAYLIGHT PETROLEUM LLC13,5001988-03-29
4007DAYLIGHT PETROLEUM LLC14,5001987-12-08
4006DAYLIGHT PETROLEUM LLC14,5001987-09-11
4003DAYLIGHT PETROLEUM LLC14,0001987-07-21
4004DAYLIGHT PETROLEUM LLC26,0001987-07-14
704DAYLIGHT PETROLEUM LLC14,0001987-03-03
702DAYLIGHT PETROLEUM LLC14,0001986-05-15
703DAYLIGHT PETROLEUM LLC14,0001986-05-15
701DAYLIGHT PETROLEUM LLC24,0001986-03-10
1409DAYLIGHT PETROLEUM LLC24,0001986-01-10
1406DAYLIGHT PETROLEUM LLC24,0001985-08-30
1407DAYLIGHT PETROLEUM LLC24,0001985-08-30
1402DAYLIGHT PETROLEUM LLC24,0001985-03-29
1401DAYLIGHT PETROLEUM LLC24,0001985-03-12