SANTA FE

Oil · District 8A · Lease #66190

Operator: SMITH PIPE OF ABILENE

Cum Oil

3 BBL

Cum Gas

1 MCF

casinghead

Wells

1

Production

1993-01 — 1993-01

Peak Month

1993-01

Production History

Cum Oil: 3 BBL Cum Gas: 1 MCF

RRC production reported through Apr 2026 · recent months incomplete

Operator History (from monthly production reports)

1996-09 — 1997-01 SMITH PIPE OF ABILENE 5 mo
1993-01 — 1996-08 DENNY OIL CO. 44 mo

Wells (1)

WELL#APIOPERATORPERMITSDEPTHLAST_ISSUED
1SMITH PIPE OF ABILENE15,0001987-08-26