Fields: ACKERLY, NORTH (DEAN SAND)
Cum Oil
48k BBL
Cum Gas
21k MCF
casinghead
Wells
1
Production
2007-09 — 2026-04
Peak Month
2008-02
Production History Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil: 47,635 BBL Cum Gas: 20,551 MCF
RRC production reported through Apr 2026 · recent months incomplete
Operator History (from monthly production reports)
Wells (1)
| WELL# | API | OPERATOR | PERMITS | DEPTH | LAST_ISSUED |
|---|---|---|---|---|---|
| 1 | 42-033-32025 | APACHE CORPORATION | 3 | 9,000 | 2008-02-08 |