Fields: ACKERLY, NORTH (DEAN SAND)
Cum Oil
18k BBL
Cum Gas
5k MCF
casinghead
Wells
1
Production
2015-08 — 2024-09
Peak Month
2015-08
Production History Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil: 18,065 BBL Cum Gas: 5,008 MCF
RRC production reported through Apr 2026 · recent months incomplete
Decline Curve Analysis
qi
1,104 BBL/mo
Di (annual)
163.8%
b-factor
0.7
EUR
22,262 BBL
R-squared
0.649
type
hyperbolic
Operator History (from monthly production reports)
Wells (1)
| WELL# | API | OPERATOR | PERMITS | DEPTH | LAST_ISSUED |
|---|---|---|---|---|---|
| 1 | 42-115-33156 | COMPASS ENERGY OPERATING LLC | 2 | 9,600 | 2015-07-23 |