Fields: HARRIS (SAN ANDRES)
Cum Oil
2k BBL
Cum Gas
255 MCF
casinghead
Wells
1
Production
2018-08 — 2019-04
Peak Month
2018-10
Production History Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil: 2,112 BBL Cum Gas: 255 MCF
RRC production reported through Apr 2026 · recent months incomplete
Operator History (from monthly production reports)
Wells (1)
| WELL# | API | OPERATOR | PERMITS | DEPTH | LAST_ISSUED |
|---|---|---|---|---|---|
| 1H | 42-165-38722 | BCE-MACH III LLC | 1 | 4,900 | 2018-06-15 |