Fields: PLATANG (SAN ANDRES)
Cum Oil
80k BBL
Cum Gas
205k MCF
casinghead
Wells
1
Production
2020-06 — 2026-04
Peak Month
2020-07
Production History Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil: 80,108 BBL Cum Gas: 204,716 MCF
RRC production reported through Apr 2026 · recent months incomplete
Decline Curve Analysis
qi
1,460 BBL/mo
Di (annual)
13.8%
b-factor
0.0
EUR
126,913 BBL
R-squared
0.352
type
exponential
Operator History (from monthly production reports)
Wells (1)
| WELL# | API | OPERATOR | PERMITS | DEPTH | LAST_ISSUED |
|---|---|---|---|---|---|
| 1XH | 42-501-36905 | RING ENERGY, INC. | 1 | 9,000 | 2017-11-15 |