Fields: PLATANG (SAN ANDRES)
Cum Oil
29k BBL
Cum Gas
79k MCF
casinghead
Wells
1
Production
2020-06 — 2026-03
Peak Month
2020-08
Production History Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil: 28,707 BBL Cum Gas: 78,680 MCF
RRC production reported through Apr 2026 · recent months incomplete
Decline Curve Analysis
qi
611 BBL/mo
Di (annual)
17.4%
b-factor
0.1
EUR
46,670 BBL
R-squared
0.658
type
hyperbolic
Operator History (from monthly production reports)
Wells (1)
| WELL# | API | OPERATOR | PERMITS | DEPTH | LAST_ISSUED |
|---|---|---|---|---|---|
| 1H | 42-501-36967 | WHITE STRIDE LLC | 2 | 5,650 | 2018-03-07 |