Fields: PLATANG (SAN ANDRES)
Cum Oil
123k BBL
Cum Gas
225k MCF
casinghead
Wells
1
Production
2025-02 — 2026-04
Peak Month
2025-05
Production History Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil: 123,488 BBL Cum Gas: 224,924 MCF
RRC production reported through Apr 2026 · recent months incomplete
Decline Curve Analysis
qi
14,918 BBL/mo
Di (annual)
134.4%
b-factor
0.5
EUR
258,766 BBL
R-squared
0.956
type
hyperbolic
Operator History (from monthly production reports)
Wells (1)
| WELL# | API | OPERATOR | PERMITS | DEPTH | LAST_ISSUED |
|---|---|---|---|---|---|
| 6H | 42-501-37599 | RING ENERGY, INC. | 1 | 6,500 | 2024-12-13 |