Fields: DEARING (CADDO)
Cum Oil
2k BBL
Cum Gas
20 MCF
casinghead
Wells
1
Production
1993-01 — 1999-12
Peak Month
1993-01
Production History Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil: 1,905 BBL Cum Gas: 20 MCF
RRC production reported through Apr 2026 · recent months incomplete
Decline Curve Analysis
qi
112 BBL/mo
Di (annual)
76.3%
b-factor
0.0
EUR
1,752 BBL
R-squared
0.519
type
exponential
Operator History (from monthly production reports)
Wells (1)
| WELL# | API | OPERATOR | PERMITS | DEPTH | LAST_ISSUED |
|---|---|---|---|---|---|
| 1 | 42-237-35670 | SMITH PIPE OF ABILENE | 1 | 4,999 | 1983-11-14 |