C.J.

Oil · District 09 · Lease #25219

Operator: SMITH PIPE OF ABILENE

Cum Oil

1k BBL

Cum Gas

15k MCF

casinghead

Wells

1

Production

1993-01 — 2000-03

Peak Month

1993-01

Production History

Cum Oil: 1,092 BBL Cum Gas: 14,866 MCF

RRC production reported through Apr 2026 · recent months incomplete

Operator History (from monthly production reports)

2000-11 — 2001-11 SMITH PIPE OF ABILENE 13 mo
1993-01 — 2000-10 ENERGYPRO, INC. 94 mo

Wells (1)

WELL#APIOPERATORPERMITSDEPTHLAST_ISSUED
1SMITH PIPE OF ABILENE14,9901985-03-13