VAL HOTZ

Oil · District 02 · Lease #6864

Operator: ESENJAY PETROLEUM CORP.

Cum Oil

10k BBL

Cum Gas

24k MCF

casinghead

Wells

1

Production

1993-01 — 1995-12

Peak Month

1995-01

Production History

Cum Oil: 10,113 BBL Cum Gas: 24,427 MCF

RRC production reported through Apr 2026 · recent months incomplete

Decline Curve Analysis

qi

672 BBL/mo

Di (annual)

250.6%

b-factor

0.0

EUR

3,226 BBL

R-squared

0.373

type

exponential

Operator History (from monthly production reports)

1995-02 — 2011-10 DUSTER PRODUCTION, INC. 201 mo
1993-01 — 1995-01 ESENJAY PETROLEUM CORP. 25 mo

Wells (1)

WELL#APIOPERATORPERMITSDEPTHLAST_ISSUED
1JTB OIL COMPANY INC.29,8001996-03-14