Fields: COOLEY (WILCOX, UPPER)
Cum Oil
47k BBL
Cum Gas
139k MCF
casinghead
Wells
1
Production
2008-06 — 2016-11
Peak Month
2008-07
Production History Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil: 46,730 BBL Cum Gas: 139,289 MCF
RRC production reported through Apr 2026 · recent months incomplete
Decline Curve Analysis
qi
2,993 BBL/mo
Di (annual)
105.6%
b-factor
0.2
EUR
42,457 BBL
R-squared
0.950
type
hyperbolic
Operator History (from monthly production reports)
Wells (1)
| WELL# | API | OPERATOR | PERMITS | DEPTH | LAST_ISSUED |
|---|---|---|---|---|---|
| 1 A | 42-157-32189 | HAMMAN OIL & REFINING COMPANY | 3 | 13,800 | 2008-08-28 |