Fields: SOUTHERN BAY (EAGLE FORD)
Cum Oil
176k BBL
Cum Gas
132k MCF
casinghead
Wells
1
Production
2023-06 — 2026-04
Peak Month
2023-07
Production History Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil: 176,386 BBL Cum Gas: 131,526 MCF
RRC production reported through Apr 2026 · recent months incomplete
Decline Curve Analysis
qi
23,094 BBL/mo
Di (annual)
383.7%
b-factor
0.9
EUR
315,640 BBL
R-squared
0.968
type
hyperbolic
Operator History (from monthly production reports)
Wells (1)
| WELL# | API | OPERATOR | PERMITS | DEPTH | LAST_ISSUED |
|---|---|---|---|---|---|
| 2H | 42-149-33576 | FW EAGLE FORD I, LLC | 1 | 14,500 | 2023-03-23 |