BOYD, JOHN

Oil · District 7B · Lease #16116

Operator: SMITH PIPE OF ABILENE

Cum Oil

0 BBL

Cum Gas

0 MCF

Wells

2

Production

1993-01 — 1998-10

Peak Month

1993-01

Production History

Cum Oil: 0 BBL Cum Gas: 0 MCF

RRC production reported through Apr 2026 · recent months incomplete

Operator History (from monthly production reports)

1995-04 — current SMITH PIPE OF ABILENE 43 mo
1993-01 — 1995-03 L.C.S. PRODUCTION COMPANY 27 mo

Wells (2)

WELL#APIOPERATORPERMITSDEPTHLAST_ISSUED
1SMITH PIPE OF ABILENE12,6001982-12-31
4SMITH PIPE OF ABILENE12,7001980-07-21