HISE, A.

Oil · District 7B · Lease #18548

Operator: SMITH PIPE OF ABILENE

Cum Oil

0 BBL

Cum Gas

0 MCF

Wells

2

Production

1993-01 — 2026-07

Peak Month

1993-01

Production History

Cum Oil: 0 BBL Cum Gas: 0 MCF

RRC production reported through Apr 2026 · recent months incomplete

Operator History (from monthly production reports)

2013-06 — current SMITH PIPE OF ABILENE 158 mo
1993-01 — 2013-05 NORTH RIDGE CORPORATION 245 mo

Wells (2)

WELL#APIOPERATORPERMITSDEPTHLAST_ISSUED
2SMITH PIPE OF ABILENE13,6101982-09-10
1SMITH PIPE OF ABILENE14,0001982-04-29