AMERSON, C. P.

Oil · District 7B · Lease #2515

Operator: SOJOURNER DRILLING CORPORATION

Fields: HAMLIN, EAST

Cum Oil

239k BBL

Cum Gas

21 MCF

casinghead

Wells

8

Production

1993-01 — 2026-04

Peak Month

2002-01

Production History

Cum Oil: 239,395 BBL Cum Gas: 21 MCF

RRC production reported through Apr 2026 · recent months incomplete

Decline Curve Analysis

qi

1,079 BBL/mo

Di (annual)

4.5%

b-factor

0.0

EUR

258,094 BBL

R-squared

0.443

type

exponential

Operator History (from monthly production reports)

2001-07 — 2026-07 SOJOURNER DRILLING CORPORATION 301 mo
1993-01 — 2001-06 MONCRIEF, W. A., JR. 102 mo

Wells (8)

WELL#APIOPERATORPERMITSDEPTHLAST_ISSUED
13SOJOURNER DRILLING CORPORATION15,3002022-02-14
11SOJOURNER DRILLING CORPORATION13,6501985-01-04
242-253-03044SOJOURNER DRILLING CORPORATION------
342-253-03045SOJOURNER DRILLING CORPORATION------
442-253-03046SOJOURNER DRILLING CORPORATION------
642-253-03048SOJOURNER DRILLING CORPORATION------
742-253-20004SOJOURNER DRILLING CORPORATION------
842-253-20123SOJOURNER DRILLING CORPORATION------