Fields: ACE-TINER (CANYON REEF)
Cum Oil
24k BBL
Cum Gas
59k MCF
casinghead
Wells
1
Production
1993-01 — 1996-07
Peak Month
1996-01
Production History Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil: 23,724 BBL Cum Gas: 59,000 MCF
RRC production reported through Apr 2026 · recent months incomplete
Decline Curve Analysis
qi
1,555 BBL/mo
Di (annual)
156.6%
b-factor
1.0
EUR
52,127 BBL
R-squared
0.923
type
hyperbolic
Operator History (from monthly production reports)
Wells (1)
| WELL# | API | OPERATOR | PERMITS | DEPTH | LAST_ISSUED |
|---|---|---|---|---|---|
| 1 | 42-253-34011 | PATTERSON PETROLEUM INC. | 2 | 4,600 | 1996-09-12 |