GRAND ROBERTSON B UNIT

Oil · District 7B · Lease #26868

Operator: SMITH PIPE OF ABILENE

Cum Oil

0 BBL

Cum Gas

0 MCF

Wells

2

Production

1993-04 — 1996-03

Peak Month

1993-04

Production History

Cum Oil: 0 BBL Cum Gas: 0 MCF

RRC production reported through Apr 2026 · recent months incomplete

Operator History (from monthly production reports)

1995-08 — current SMITH PIPE OF ABILENE 8 mo
1993-04 — 1995-07 MESQUITE OIL & GAS PRODUCTION 28 mo

Wells (2)

WELL#APIOPERATORPERMITSDEPTHLAST_ISSUED
1 CMYJO OIL CORPORATION24,4741991-05-28
1CMYJO OIL CORPORATION24,4741991-05-28