OPAL

Oil · District 7B · Lease #26987

Operator: SMITH PIPE OF ABILENE

Cum Oil

97 BBL

Cum Gas

62 MCF

casinghead

Wells

1

Production

1993-04 — 1993-06

Peak Month

1993-04

Production History

Cum Oil: 97 BBL Cum Gas: 62 MCF

RRC production reported through Apr 2026 · recent months incomplete

Operator History (from monthly production reports)

1993-08 — 1993-11 SMITH PIPE OF ABILENE 4 mo
1993-04 — 1993-07 BRYANS, LEONARD 4 mo

Wells (1)

WELL#APIOPERATORPERMITSDEPTHLAST_ISSUED
1SMITH PIPE OF ABILENE35,8001993-06-11